I bet you're excited, I can remember how exciting it was for us to receive the plans and elevations.Our retaining wall on the fill side of the block was 450mm high & 7.2m long, on the cut side it was 400mm high & 10m long.We are building in the Tweed shire. How long do they think it will take to go through the Lismore council?
I bet you're excited, I can remember how exciting it was for us to receive the plans and elevations.
ReplyDeleteOur retaining wall on the fill side of the block was 450mm high & 7.2m long, on the cut side it was 400mm high & 10m long.
We are building in the Tweed shire. How long do they think it will take to go through the Lismore council?